Blue Crane

Blue Crane

Have a look at

izimvu ENERGY FACILITY

Izimvu Battery Energy Storage System (BESS) and Associated Infrastructure near Rustenburg, North West Province.

Izimvu Energy Facility (RF) Pty Ltd proposes the development of a BESS and required associated infrastructure such as substations and/or power lines, access roads, operation and maintenance buildings and fencing, to name a few. The capacity of the BESS will be up to 77 MW and is proposed to be bid as part of the Department of Mineral Resources and Energy (DMRE) bid window 2 for BESS development. The development is proposed on Erf 2290, Rustenburg Extension 9 Township, situated within the Rustenburg Local Municipality, Bonjanala Platinum District Municipality. The development is located directly adjacent to the town of Rustenburg

An area of 2.1 ha is under assessment for the placement of the development footprint.

The draft Basic Assessment (BA) Report is available from 23 February 2024 to 25 March 2024. To gain access to all report appendices, please contact the EAP via e-mail.
 
Kindly direct all comments, queries and responses to:

Blue Crane Environmental

Marélie Botha / Aneesah Samodien

Cell: (082) 493-5166 / (067) 402 4604

E-mail: PepperEF@bcrane.co.za

Documents for public review are
available for download.